Skip to Content

The westbound lane of the Cache Bay Rd. bridge (between River St. and Dovercourt Rd.) will be closed from July 8, 2024 at 7 a.m. until July 10 at 5 p.m. to allow for inspections of the gas line suspended below the bridge.

Signage will be in place and Traffic Control Persons will be on site to help safely control the flow of traffic.

Thank you for your cooperation.

Most recent posts

MNR Watershed Conditions Statement – Flood Outlook – North Bay District

Public Notice: Possible Water Discolouration in Verner Due to Fire Hydrant Use

Information Session on Proposed Adjustments to Fire Service at Tomiko Fire Hall

Back to top