Skip to Content

Update – May 11, 2021
Watermain flushing in Cache Bay, Sturgeon Falls and Verner has been completed. We thank you for your ongoing patience.


The Water and Sewer Department is required to test all fire hydrants, and flush all watermains throughout the municipal water distribution systems. A complete flushing for all of Sturgeon Falls, Cache Bay and Verner takes place in the spring.

The work may cause some discoloration in the water; however the effect should be minimal. If discoloured water is encountered in your water service line, we recommend you run a cold water tap for a short period of time until the water is clear. If the discolouration persists, please contact us for assistance.


Schedule

Please check for signs in your area and stay tuned for updates for Sturgeon Falls and Cache Bay.

Cache Bay
Complete

Sturgeon Falls
Complete

Verner
Complete

Most recent posts

RV Dumping Stations Now Open

Upcoming COVID-19 Vaccination Clinics in West Nipissing

Load Restrictions Update

Back to top